Your Ravensdown account manager will work with you to create an eco-n recommendation for your farm, specific to your soil type, farm goals and budget.
Your eco-n recommendation shows:
A summary of your farm details
How much extra dry matter you can expect to grow using eco-n
A with or without eco-n comparison of per hectare nitrate leaching, nitrous oxide emmissions and cation leaching
How much the extra feed you will grow with eco-n will cost you, compared to the cost of other feeds
Details about best practice eco-n application for your area
Contact your local account manager or call the Customer Centre to order now
When to apply eco-n North Island

What to do in May
Begin application early May when soil temperature is 15°C and falling
Apply eco-n immediately (within 7 days) after grazing; in effect follow the cows around the farm until the farm is completed. Ensure the treated areas receive 10mm of rain or irrigation prior to the next grazing.
What to do in July
Apply eco-n mid-July to your whole farm irrespective of spring
grazing time, provided that
1. You have 10mm rain/10mm irrigation prior to the next grazing; and
2. Pasture cover is less than 3,000kgDM/ha

Based on mean soil temperature at 10cm and estimated drainage.
Eco-n needs to be applied early autumn and then again late winter by an approved applicator.
Eco-n is biodegradable so to maintain the required amount of eco-n in the soil during peak drainage periods the second application must be within 3 months of the first application.
When to apply eco-n South Island
What to do in April
Begin application early April when soil temperature is 15°C and falling
Apply eco-n immediately (within 7 days) after grazing; in effect follow the cows around the farm until the farm is completed. Ensure the treated areas receive 10mm of rain or irrigation prior to the next grazing
What to do in July
Apply eco-n mid-July to your whole farm irrespective of spring grazing time, provided that
1. You have 10mm rain/10mm irrigation prior to the next grazing; and
2. Pasture cover is less than 3,000kgDM/ha
Based on mean soil temperature at 10cm and estimated drainage.
Eco-n needs to be applied early autumn and then again late
winter by an approved applicator.
Eco-n is biodegradable so to maintain the required amount of eco-n in the soil during peak drainage periods the second application must be within 3.5 months of the first application.
Eco-n recommendations are specific to your soil type, farm goals and budget.